Construction plan Dampfkesselanlage
As low as
€57.95
incl. VAT, plus shipping
- Construction: Jörg Thielecke
- The plan is in German. A translation aid is available here
Construction: Jörg Thielecke
Technical data:
- max. operating pressure: 4 bar
- max. operating temperature: 150°C
- volume: 3 litres
Detailed
construction plan of the boiler system A2 "Gustav". The construction
plan includes four sheets A1 and 27 pages A3. Including construction
description from Maschinen im Modellbau magazine 01/2019.
cover isssue name | 3203044 |
---|---|
Auflagenname | -11 |
shipping time | 3 - 5 Tage |
Write Your Own Review